I-43 North-South Construction Update

Highland Bridge Deck Pour

About the Project:

The I-43 North-South Reconstruction project spans 14 miles from Silver Spring Drive north to WIS 60, in Milwaukee and Ozaukee counties. WisDOT is reconstructing I-43 to modern design standards and adding a lane in each direction. Additionally, five interchanges along the corridor will be reconstructed:

  • Good Hope Road
  • Brown Deer Road (constructing a new Diverging Diamond Interchange)
  • County Line Road (constructing a new full-access interchange
  • Mequon Road
  • Pioneer Road (County C)

This project also includes:

  • Construction of a brand-new interchange at Highland Road
  • Replacement of the Union Pacific Railroad bridge over I-43 in Glendale
  • Expansion of Port Washington Road in Glendale between Bender and Daphne roads

*All work is weather dependent and subject to change. Always check 511wi.gov prior to departure.

Stay Connected: Find us online at https://projects.511wi.gov/43north-south/

Pictures Attached:

  1. Highland Road Deck Pour
  2. Highland Road Bridge
  3. Port Washington Road Bridge
  4. Mainline construction at Donges Bay Road facing south
  5. Donges Bay Road Bridge

 

 

Click any thumbnail image to view a slideshow

Highland Bridge
Port Washington Bridge
I-43 from Donges Bay Road Bridge
Donges Bay Road Bridge
North End, Mequon Road and County Line Road Updates
South End and Green Bay Road Updates